In this section you can find a summary of Wärtsilä's announced orders. For information on orders received before 2012, please visit the press release archive.
Download the announced orders table in excel. The excel file includes orders from 2012–2024.
Announced orders - excel file »
2022-2024 Announced orders
Date | Business | Customer | Scope of supply | Size/value | Booked/signed |
7.11.2024 | Marine | Xiamen Port Shipping Co., Ltd., and Shanghai Marine Equipment Research Institute (SMERI) | Contract for purchase and supply of eight steerable thrusters for two 5000 BHP electrical tugs and two 4400 BHP electrical tugs | Q4 2024 | |
7.11.2024 | Portfolio Business | Gasum | Supplying biogas upgrading and liquefaction solutions for a new bioLNG plant | Q4 2024 | |
28.10.2024 | Marine | Capital Gas Ship Management | Signed a five-year Lifecycle Agreement covering seven 174,000 m3 LNG Carrier vessels | Q3 2024 | |
22.10.2024 | Portfolio Business | Hanwha Oceon Co | Four new 93,000 m3 capacity Very Large Ammonia Carrier (VLAC) vessels | Q3 2024 | |
17.10.2024 | Energy | AMP Energy | To deliver its second major energy storage project in South Australia | 150 MW/ 300 MWh | Q3 2024 |
1.10.2024 | Portfolio Business | Jiangnan Shipyard | Supply the Cargo Handling and Fuel Gas Supply systems for five new Very Large Ethane Carrier (VLEC) vessels | Q3 2024 | |
27.9.2024 | Energy | Africa Power Services | Supply the engines and auxiliary equipment for a power plant | Q1 2024 | |
26.9.2024 | Energy | Ndola Energy Company Ltd | Renewal of a Operations & Maintenance (O&M) agreement | 105 MW | Q2 2024 |
25.9.2024 | Energy | Kentucky Municipal Energy Agency (KYMEA) | Supply the engineering and equipment for a new power plant project to be installed in Madisonville, Kentucky, USA | 75 MW | Q3 2024 |
24.9.2024 | Marine | Leonhardt & Blumberg | Contracted to supply its latest carbon capture and storage-ready scrubber systems - CCS-Ready scrubbers - for three container ships | Q3 2024 | |
19.9.2024 | Marine | Chevron | Convert one engine on six of Chevron Transport Corporation Ltd.’s LNG Carriers from dual-fuel (DF) to spark gas (SG) operation | Q3 2024 | |
18.92024 | Portfolio Business | Capital Gas Ship Management | To supply the cargo handling and fuel gas supply systems for four new medium-sized gas carrier (MGC) vessels | Q3 2024 | |
18.9.2024 | Energy | Aqualectra | Contracted to provide Engineering, Procurement and Construction in support of the country’s decarbonisation programme. | Q3 2024 | |
16.9.2024 | Marine | Royal Caribbean Group | A five-year Lifecycle Agreement covering 37 cruise ships. | ||
5.9.2024 | Marine | Maritime and Port Authority of Singapore (MPA) | Awarded the prototyping tender for the revolutionary Next Generation Vessel Traffic Management System (NGVTMS) project | Q3 2024 | |
3.9.2024 | Marine | Color Line | Upgrade the exhaust treatment system onboard four vessels | Q3 2024 | |
26.8.2024 | Marine | Eidesvik | Supply the equipment for the conversion of an offshore platform supply vessel (PSV) to operate with ammonia fuel Link to release | Q3 2024 | |
19.8.2024 | Energy | QIT Madagascar Mineral | Renewal of existing Operations and Maintenance (O&M) agreement Link to release | Q1 2024 | |
30.7.2024 | Marine | Seapeak Maritime | 16-year lifecycle agreement Link to release | Q1 2024 | |
24.7.2024 | Marine | SCL Group | Sypplying hybrid-electric propulsion system for a 11,000 dwt limestone carrier Link to release | Q1 2024 | |
15.7.2024 | Energy | AVK-SEG | Cooperation agreement to deliver on-site power generation for data centers Link to release | Q2 2024 | |
11.7.2024 | Marine | James Fisher Everard Ltd. | Supplying fully integrated, mechanical drive, propulsion package for new 6000 dwt LNG-fuelled tankers | Q2 2024 | |
3.7.2024 | Portfolio Business | EXMAR LPG | Fuel supply and cargo handling systems for two new gas carriers that will operate with ammonia fuel | Q2 2024 | |
19.6.2024 | Marine | International Seaways | Supplyng EnergoFlow and EnergoProFin propulsion solutions to four medium range (“MR”) tankers | Q1 2024 | |
5.6.2024 | Marine | La Meridionaly, a subsidiary of CMA CGM | To supply engines, fuel gas supply system and thrusters for two new Ropax ferries | Q2 2024 | |
29.5.2024 | Marine | Shin Nikohai Ferry | Two Lifecycle Agreements for two ferries | Q2 2024 | |
28.5.2024 | Energy | Centrica Distributed Generation Ltd | Supplying power plant to support the growing use of renewables in the UK | 48 MW | Q2 2023 |
23.5.2024 | Marine | Scandilines | To supply electrical systems needed to convert two ferries to a plug-in hybrid solution | Q2 2024 | |
20.5.2024 | Energy | Aqualectra | To supply the Caribbean island of Curaҫao with a Battery Energy Storage System (BESS) | 25 MW / 25 MWh | Q2 2024 |
8.5.2024 | Marine | Vardin and Framherji | Latest addition to the company’s engine portfolio, the Wärtsilä 25, for a new 44-metre long stern trawler | Q1 2024 | |
7.5.2024 | Energy | Mangal Industries | A ten-year Operations and Maintenance (O&M) Agreement for a captive power plant | Q2 2024 | |
25.4.2024 | Marine | Eramine Sudamerica | Signed a three-year Operations & Maintenance (O&M) agreement (with an option to extend for two more years) | Q1 2024 | |
25.4.2024 | Marine | COSCO Shipping Lines Co., Ltd | Methanol-fuelled auxiliary engines for five new container vessels | Q4 2023 | |
24.4.2024 | Marine | Scale Gas | Supplying cargo handling system for a new 12,500 m3 LNG bunkering vessel | Q1 2024 | |
23.4.2024 | Marine | Sallaum Lines DMCC | Supply a range of solutions aimed at minimising the carbon footprint of six new Pure Car Truck Carrier (PCTC) vessels | 2023 and remainder in Q1 2024 | |
22.4.2024 | Portfolio Business | Oceania | Supply the cargo handling and fuel gas supply systems for three new 98k Very Large Ethane Gas Carrier (VLEC) vessels | Q1 2024 | |
18.4.2024 | Portfolio Business | Purus | Supply cargo handling and fuel supply systems for three new large sized ethane gas carrier (VLEC) vessels | Q1 2024 | |
17.4.2024 | Energy | Lower Colorado River Authority LCRA | Order for a 10 Wärtsilä 50SG engines | Q1 2024 | |
4.4.2024 | Marine | HD Hyundai Heavy Industries Co Ltd. | Suppling Cargo Handling Systems for additional two new very large LPG carrier vessels | Q1 2024 | |
26.4.2024 | Marine | CSBC-DEME Wind Engineering Co Ltd (CDWE) | A long-term Guaranteed Asset Performance agreement | Q1 2024 | |
19.3.2024 | Marine | KMTC | A five-year Lifecycle Agreement | Q1 2024 | |
14.3.2024 | Marine | P&O Ferries | Lifecycle Agreement to support optimised low-emission operations for two P&O Ferries vessels | Q1 2024 | |
22.2.2024 | Energy | City of Farmington | To provide equipment for an 18 MW expansion to an existing power plant in New Mexico, USA, utilizing reciprocating internal combustion engine (RICE) technology | Q4 2023 | |
15.2.2024 | Energy | Zenobe | To supply 300 MW / 600 MWh energy storage system under an Engineered Equipment Delivery (EEQ) contract | 300 MW / 600 MWh | Q1 2024 |
8.2.2024 | Marine | EXMAR LPG | Delivering fuel supply systems for two new gas carriers operating with ammonia fuel | Q1 2024 | |
6.2.2024 | Marine | Irish Naval Service | A five-year Optimised Maintenance Agreement | Q1 2024 | |
25.1.2024 | Marine | Carnival Corporation & Plc | One-year extension to the Performance based agreement | Q4 2023 | |
9.1.2024 | Energy | Sindh Nooriabad Power Company (SNPC) | Operation & Maintenance (O&M) agreement 12-year renewal | Q4 2023 |
Date | Business | Customer | Scope of supply | Value/size | Booked/signed |
19.12.2023 | Marine Systems | Pasco Gas | Supplying the cargo handling and LPG (liquefied petroleum gas) fuel supply systems for a new Medium Gas Carrier (MGC) vessel | Q4 2023 | |
14.12.2023 | Marine Systems | Norwegian shipowner Avance Gas | Supplying cargo handling and fuel supply systems for four new 40,000 m3 gas carrier vessels | Q4 2023 | |
12.12.2023 | Energy | Tampa Electric Company (TECO) | Supplying energy storage system | 15 MW/30 MWh | Q1 2023 |
12.12.2023 | Marine Power | Aasen Shipping | An integrated hybrid propulsion solution for three new self-discharging cargo vessels | Q3 2023 | |
11.12.2023 | Marine Systems | Tekniska Verken | To supply, install, commission and start-up the biogas upgrading and liquefaction units | Q4 2023 | |
30.11.2023 | Energy | KEPCO E&C | Supplying the generating sets for two Indonesian power plants | 30MW | Q4 2023 |
29.11.2023 | Marine Systems | HMD | Cargo Handling Systems (CHS) for four new medium gas carrier vessels | Q4 2023 | |
23.11.2023 | Marine Power | Hafnia | Supplying EnergoFlow and EnergoProFin solutions for ten Bird Class oil and chemical tankers | Q4 2023 | |
21.11.2023 | Marine Power | South-Eastern Finland University of Applied Sciences (Xamk) | To supply its latest simulator technology for a new maritime training centre | Q4 2023 | |
7.11.2023 | Marine Systems | Solvang | To supply Cargo Handling Systems for five LPG carrier vessels | Q3 2023 | |
30.10.2023 | Energy | Phil. Gold Processing & Refining Corp | A five-year renewal of Operation and Maintenance (O&M) Agreement | 47 MW | Q3 2023 |
12.10.2023 | Marine Power | Sallaum Lines DMCC Dubai | Decarbonisation Programme applied to two vessels | Q3 2023 | |
5.10.2023 | Marine Power | Orient Express Silenseas | Supplying Wärtsilä 25DF dual-fuel (LNG) engine | Q2 2023 | |
27.9.2023 | Energy | AES | A renewal of a long-term service agreement for four years | Q2 2023 | |
14.9.2023 | Energy | Omaha Public Power District (OPPD) | A ten-year Guaranteed Asset Performance (GAP) agreement | Q3 2023 | |
13.92023 | Marine Power | Stena RoRo | Supplying an integrated hybrid propulsion system | Q2 & Q3 2023 | |
7.9.2023 | Marine Power | China LNG Shipping (International) Company Ltd. | Technical Management Agreement | Q3 2023 | |
28.8.2023 | Energy | ContourGlobal | A long-term service agreement for two years | 86 MW | Q1 2023 |
24.8.2023 | Marine Power | Brazilian Navy | To supply the main power generation and power conversion system | Q3 2023 | |
24.8.2023 | Marine Power | Incat Tasmania | Powering the biggest battery electric ship ever built with its battery electric propulsion system and waterjets | Q2 2023 | |
15.8.2023 | Marine Systems | Köppö Energia Oy | To provide a front-end engineering design (FEED) for the liquefaction and storage of liquefied synthetic methane (LSM) | Q3 2023 | |
1.8.2023 | Marine Power | CMA CGM | Supplying methanol-fuelled auxiliary engines | Q2 2023 | |
5.7.2023 | Energy | Geradora de Energia do Amazonas (Gera Amazonas) | Two-year renewal of Operation & Maintenance agreement | Q2 2023 | |
27.6.2023 | Marine Power | Stena Line | Methanol conversions including fuel supply systems and engine modifications | Q2 2023 | |
20.6.2023 | Marine Power | NSB Group | Simulator for NSB’s Maritime Training Centre | Q1 2023 | |
15.6.2023 | Marine Systems | LNG Hrvatska | New regasification module for LNG terminal | Q2 2023 | |
13.6.2023 | Marine Systems | Gasum AB | Know-how and equipment for bioLNG project | Q2 2023 | |
1.6.2023 | Marine Power | Transworld Group | Decarbonisation modelling capabilities for the bulk carriers | Q4 2022 | |
31.5.2023 | Marine Power | NYK LNG Ship Management | An eight-year Guaranteed Asset Performance agreement | Q1 2023 | |
25.5.2023 | Marine Power | SIMAC | Wärtsilä 20 engine to Denmark’s leading maritime education centre | Q2 2023 | |
23.5.2023 | Marine Power | Corsica Ferries | Decarbonisation Modelling on two vessels | Q1 2023 | |
16.05.2023 | Marine Power | Corsica Linea | A ten-year Guaranteed Asset Performance (GAP) agreement | Q4 2022 | |
15.05.2023 | Marine Systems | Energos Infrastructure | A reliquefaction system for a retrofit project on an LNG carrier vessel | Q1 2023 | |
03.05.2023 | Energy | EDF Renewables UK | Energy storage system | 57 MW / 114 MWh | Q1 2023 |
20.4.2023 | Energy | Origin Energy | Energy storage system | 460 MW / 920 MWh | Latest Q3 2023 |
18.4.2023 | Marine Power | Furetank | Maritime educational centre with a simulation training lab | Q1 2023 | |
12.4.2023 | Marine Power | 3R Petroleum | 5-year Optimised Maintenance Agreement and operational support | Q4 2022 | |
5.4.2023 | Marine Power | Erik Thun | Wärtsilä 25 engines for four chemical tankers | Q1 2023 | |
3.4.2023 | Marine Power | Debmarine Namibia | A three-year Technical Management Agreement (TMA) | Q4 2022 | |
31.3.2023 | Energy | Rio Amazonas Energia (RAESA) | Operations & Maintenance agreement for a power plant in Manaus, Brazil | Q1 2023 | |
31.3.2023 | Marine Systems | Hyundai Heavy Industries (HHI) shipyard | Cargo Handling and integrated Fuel Gas Supply systems for Very Large Ethane Carrier (VLEC) vessels | Q1 2023 | |
29.3.2023 | Marine Systems | Hudong Zhonghua Shipyard | Reliquefaction systems for eight LNG carriers | Q1 2023 | |
28.03.2023 | Marine Power | Celebrity Cruises | Two 8-cylinder Wärtsilä 46F engines capable of operating with methanol as fuel, two 12-cylinder Wärtsilä 46F engines, and one Wärtsilä 32 engine | Q1 2023 | |
23.3.2023 | Marine Power | Livestock Express | Five-year guaranteed asset performance agreement | Q1 2023 | |
14.3.2023 | Marine Systems | Transwaste | Biogas upgrading solution | Q1 2023 | |
13.3.2023 | Marine Power | National Petroleum Construction Company (NPCC) | A five-year Optimised Maintenance Agreement | Q4 2022 | |
8.3.2023 | Marine Systems | Asian based yard | Carbon capture and storage-ready scrubber systems | Q4 2022 | |
6.3.2023 | Marine Systems | Pacific Gas of Hong Kong | Cargo Handling and Fuel Supply systems for four new Very Large Ethane Carrier (VLEC) vessels | Q1 2023 | |
1.3.2023 | Marine Power | Chilean Navy | Main propulsion machinery, as well as a range of other equipment and systems for two new amphibious transport vessels | Q1 2023 | |
23.2.2023 | Marine Power | Höegh LNG Fleet Management (HLNG) | A five-year extension of Maintenance Agreement | Q4 2022 | |
20.2.2023 | Energy | Zenobē | A 200-megawatt (MW) / 400-megawatt hour (MWh) energy storage system | 200 MW / 400 MWh | Q1 2023 |
6.2.2023 | Marine Power | Baleària | Dual-fuel engines, waterjets, and LNG fuel storage and supply systems for a new High-Speed Ro-Pax ferry | Q2 2022 | |
2.2.2023 | Energy | Lower Colorado River Authority (LCRA) | Ten Wärtsilä 50SG engines for a peaker power plant | 190 MW | Q3 2022 |
30.1.2023 | Marine Systems / Marine Power | Pacific International Lines (PIL) | LNG Fuel Gas Supply System, Propulsion Control System and Alarm Monitoring and Control System for four new LNG container ships | Q4 2022 | |
27.1.2023 | Energy | Major EPC contractor in Latin America | 18 Wärtsilä 50SG gas engines | More than 100 MEUR | Q4 2022 |
26.1.2023 | Marine Systems | Biogas Mönsterås | Biogas liquefaction technology | Q4 2022 | |
25.1.2023 | Energy | Basin Electric | Six Wärtsilä 50SG gas engines for a new balancing power plant | 108 MW | Q4 2022 |
10.1.2023 | Energy | Major American investor-owned utility | Eight Wärtsilä 34DF engines for two power plants | 75 MW | Q4 2022 |
Date | Business | Customer | Scope of supply | Size/value | Booked/signed |
20.12.2022 | Marine Power | SAL Heavy Lift GmbH | Hybrid propulsion system for four new heavy lift vessels | Q4 2022 | |
16.12.2022 | Energy | EDF Renewables | 50 MW / 100 MWh grid-scale energy storage facility | 50 MW / 100 MWh | Q4 2022 |
5.12.2022 | Marine Systems | EXMAR LPG | Cargo Handling and LPG Fuel Supply systems | Q4 2022 | |
29.11.2022 | Marine Power | Hidrovias do Brasil | Re-powering project including three Wärtsilä 20 engines, three fixed pitch propellers, three gearboxes, and propulsion controls | Q1 2022 | |
24.10.2022 | Marine Systems | Germany’s Federal Ministry of Education and Research | Electrical system package for a new German research vessel | Q3 2022 | |
18.10.2022 | Marine Systems | St1 | A biogas upgrading and liquefaction solution for a new biogas plant | Q3 2022 | |
13.10.2022 | Energy | Japanese power plant | Ten Wärtsilä 34SG gas engines for a new 100 MW Japanese power plant | Q3 2022 | |
12.10.2022 | Energy | Musandam Power Company SAOG (MPC) | A three-year extension of an Operations and Maintenance (O&M) agreement for an independent power plant | Q2 2022 | |
5.10.2022 | Marine Power | Capital Gas Ship Management Corp. | A partnership in the development of a new Fleet Decarbonisation Programme | Q2 2022 | |
4.10.2022 | Marine Systems | AS Agrofirma Tervete | A BioLNG plant | Q3 2022 | |
3.10.2022 | Energy | Nevada Gold Mines LLC | Performance upgrade of a captive power plant | Q2 2022 | |
29.9.2022 | Marine Power | Companhia Brasileira de Offshore (CBO) | Agreement for Decarbonisation Modelling | Q3 2022 | |
26.9.2022 | Energy | Caribbean Utilities Company Ltd (CUC) | Two 10-megawatt (MW) / 10-megawatt hour (MWh) energy storage systems | 10 MW / 10 MWh | Q3 2022 |
13.9.2022 | Marine Power | Karstensens yard | Propulsion machinery for four new fishing vessels | Q1 2022 | |
8.9.2022 | Marine Systems | Nature Energy | Two-year tailored Service Agreement covering six existing biogas plants | Q3 2022 | |
8.9.2022 | Marine Power | CLdN | Innovative hybrid design for two new RoRo vessels | Q2 2022 | |
5.9.2022 | Marine Power | Shanghai CSIC Marine Propulsion Equipment | Advanced thruster solution for a new hybrid tug | Q2 2022 | |
1.9.2022 | Marine Power | Alianҫa Navegaҫão e Logística | Engines for two new Articulated Tug Barges (ATBs) | Q2 2022 | |
31.8.2022 | Marine Power | Buquebus | Engines, waterjets, and fuel storage and supply system for a new high speed catamaran ferry | Q3 2022 | |
30.8.2022 | Energy | Electricidade de Timor Leste (EDTL) | Three-year renewal of an Operation and Maintenance (O&M) agreement covering two power plants | Q2 2022 | |
22.8.2022 | Energy | Kribi power development company (KPDC) | Upgrading project of a power plant's electrical and automation systems | Q3 2022 | |
16.8.2022 | Energy | Sabodala Gold Operations | 18 MW extension to the power generating facility and upgrade of the electrical and automation system | Q3 2022 | |
11.7.2022 | Energy | Clearway Energy Group | Portfolio of energy storage systems for five sites | 500 MWac / 2 GWh | Q1 2021 - Q3 2022 |
6.7.2022 | Energy | FATA SpA | Four Wärtsilä 50SG engines for a 75 MW power plant | Q2 2022 | |
28.6.2022 | Marine Systems | Knutsen OAS | Three Compact Reliq reliquefaction plants | Q2 2022 | |
27.6.2022 | Energy | SSE | A 50 MW / 100 MWh energy storage system | 50 MW / 100 MWh | Q2 2022 |
23.6.2022 | Voyage | Zanzibar Ports Corporation | Vessel Traffic Services (VTS) system and VTEK Technology’s Terminal Operating System (TOS) | Q2 2022 | |
21.6.2022 | Marine Power | Stena RoRo | Hybrid propulsion system for three new RoPax vessels | Q2 2022 | |
15.6.2022 | Energy | African gold mine | 5-year performance-based agreement for a 20 MW power plant combined with a 40 MW plant extension installation | Q1 2022 | |
14.6.2022 | Marine Systems | Ecotricity | Puregas CA50 biogas upgrading plant for a green gas mill | Q2 2022 | |
13.6.2022 | Energy | Termocabo S.A. | Full Operation and Maintenance (O&M) agreement covering a 48 MW power plant | Q2 2022 | |
2.6.2022 | Marine Power | NYK LNG Ship Management | A long-term Guaranteed Asset Performance Agreement covering the engines and related equipment for an LNG Carrier vessel | Q1 2022 | |
25.5.2022 | Marine Power | Maran Gas Maritime | Renewal of Optimised Maintenance Agreement for 21 TFDE LNG carrier vessels | Q2 2022 | |
24.5.2022 | Energy | WEC Energy Group | Seven Wärtsilä 50SG gas engines for a 128 MW power plant project | 128 MW | Q2 2022 |
5.5.2022 | Marine Power | Eastaway Ship Management | Power Limitation Solutions for six vessels | Q1 2022 | |
27.4.2022 | Marine Systems | REEFUELERY GmbH | Equipment for a plant capable of liquefying bio-methane and synthetic methane from renewable energy sources to produce carbon-neutral transportation fuel | Q1 2022 | |
26.4.2022 | Energy | Antigua Power Company Limited (APCL) | Supply and install of a 46 MW dual-fuel power plant | 46 MW | Q1 2022 |
25.4.2022 | Energy | Kahraba | Approximately 20 MW of added output to the existing Borg El Arab power plant | 20 MW | Q1 2022 |
22.4.2022 | Marine Power | Carnival Corporation | Decarbonisation Modelling Service | Q4 2021 | |
13.4.2022 | Marine Power | MMS Co., Ltd. | Optimised Maintenance Agreements (OMAs) covering two LNG carrier vessels | Q1 2022 | |
12.4.2022 | Energy | Malicounda Power SAS | 10-year Guaranteed Asset Performance agreement covering a 130 MW power plant | Q1 2022 | |
25.3.2022 | Marine Power | Brittany Ferries | 10-year service agreement for broad scope of solutions installed on a RoPax vessel | Q4 2021 | |
22.3.2022 | Marine Power | Krossbrekka P/F | Range of propulsion solutions, including Wärtsilä 31 main engine | Q1 2022 | |
21.3.2022 | Marine Systems | Knutsen OAS | Service agreement covering the reliquefaction plant for four LNG Carrier vessels | Q1 2022 | |
16.3.2022 | Energy | Argonaut Gold Inc. | A natural gas fuelled engine power plant | 22 MW | Q1 2022 |
10.3.2022 | Marine Systems | Guangzhou Shipyard International (GSI) | Exhaust gas cleaning systems for two newbuild 218m RoPax vessels | Q1 2022 | |
9.3.2022 | Marine Power | SeaRoad Shipping | Main and auxiliary engines, fuel storage tanks, gas handling equipment and electrical systems for a new RoRo | Q1 2022 | |
1.3.2022 | Marine Power | Viking Line | Technical management for a broad scope of solutions under a three-year contract | Q4 2021 | |
16.2.2022 | Energy | Italian industrial company | Ten-year long-term service agreement covering two industrial combined heat and power (CHP) plants | Q4 2021 | |
15.2.2022 | Marine Power | Remontowa shipyard | Engines, fuel storage and supply systems for three new LNG-fuelled RoPax vessels | Q1 2022 | |
8.2.2022 | Marine Power | Societé des Traversiers du Quebec (STQ) | Five-year Optimised Maintenance Agreement covering two ferries | Q4 2021 | |
27.1.2022 | Energy | Goldmine company in Suriname | Energy storage system | 7.8 MW / 7.8 MWh | Q4 2021 |
25.1.2022 | Marine Power, Voyage | Stena RoRo | Broad scope of Wärtsilä power solutions for gas-fuelled ferry trio | Q4 2021 | |
24.1.2022 | Marine Power | Van Oord | Five Wärtsilä 32 engines capable of operating with methanol | Q1 2022 | |
20.1.2022 | Energy | A2A Gencogas | A natural gas fuelled 110 MW flexible power plant | 110 MW | Q1 2022 |
19.1.2022 | Marine Power | Asian shipbuilder | 42xWärtsilä 31DF Main Engines and 14xWärtsilä 20DF Harbour Engines to a series of shuttle tankers | More than 100 MEUR | Q4 2021 |
10.1.2022 | Marine Power | NYK Shipmanagement | A 13-year Optimised Maintenance Agreement for an LNG carrier vessel | Q4 2021 | |
4.1.2022 | Marine Power, Marine Systems, Voyage | CMA CGM | Broad scope of solutions for 12 new LNG-fuelled container ships | Q3 and Q4 2021 |