Who | Centrica |
What | 2 x 50 MW Flexible balancing |
Where | United kingdom |
How | EPC (Engineering, procurement & construction) |
households powered in the UK
and less, to full power after start
MW of total electrical output
The under two-minute start up time is a rare feature and very important to the UK grid.
Balancing the intermittency of renewable power sources
Need for quick responding power supply during demand peaks
Transition towards a low-carbon energy system
Adding flexibility to the grid with two 50 MW engine-based power plants
Power plant with under two-minute start up time
Flexible capacity enabling the growing share of intermittent renewables
Enabling the growing share of renewables
Stable and balanced grid at all time
Greener energy and reduced carbon footprint in the UK
Customer | Centrica |
Type | Wärtsilä 34SG gas power plant |
Operating mode | Fast reserve and balancing markets |
Gensets | 2 x 5 Wärtsilä 20V34SG |
Total output | 2 x 50 MW |
Fuel | Natural gas |
Scope | EPC (engineering, procurement and construction) |
Delivered | 2018 |
Fill in a contact form and our experts aim to be in contact within 1-2 business days. Contact us »
Read about our solutions to get all the details.
Find a Wärtsilä office near you. Access the global address book ».
Wärtsilä successfully hands over two new plants to support the UK’s need for fast-starting flexibility
Wärtsilä to supply two 50 MW power plants to the United Kingdom