IPP-3-power-plant-Wärtsilä-Reference-Case

IPP3 power plant

The Amman Asia Electric Power Company recommissioned the engines of the world’s largest combustion engine power plant for gas operation. This has resulted in an increased plant load factor by 3.5%, savings in operational costs, because it is not necessary to operate the SCR system anymore. The operational savings, by not having to purchase urea, amount to approximately USD 52,000 per day.

Read more about the case (PDF)

We have achieved full flexibility in our IPP3 power plant. This means that we can now fulfill our power production agreement with an improved economy and significantly smaller environmental footprint

Mr. Jubok Lee, Operation Director of AAEPC

Challenge

Fulfilling highly detailed commissioning procedures

Preventing the risk of part failures during commissioning

Solution

Preparing procedure documentation and commissioning to gas operation of 38 Wärtsilä 18V50DF engines

Benefits

Clear savings in operating costs

Significantly reduced emission levels

Contact us

Please fill in the form, we aim to respond within 1-2 business days depending on the enquiry. For an existing installation, provide all necessary details to identify the installation and the equipment. Fields indicated with an asterisk (*) are required.