A repeat order for a 50 MW power barge from the Caribbean island

Wärtsilä Corporation won a repeat order for a 50 MW power barge from the Caribbean island of Jamaica in April 2005. It joined the existing 74 MW Wärtsilä power barge delivered ten years before.

The new power barge was ordered by the independent power producer (IPP) Jamaica Energy Partners LLC under a turnkey contract.

Jamaica Energy Partners is a company controlled by the Latin Power Funds I and II. These funds, formerly known as the Scudder Latin America (SLAP) funds, are today managed by Conduit Capital Partners out of New York City. This deal constitutes the fourth transaction between the LP funds and Wärtsilä throughout the course of a successful long-term relationship.

The new barge is equipped with three generating sets, each driven by a Wärtsilä 18V46 engine. The barge is provided with all necessary ancillary equipment for independent operation, including treatment plant for the heavy fuel oil used by the engines and a 138 kV electrical substation.

The barge was constructed and outfitted in Singapore. Delivery of the barge to Jamaica took place in December 2005, just 12 months after the contract was signed. The barge is located in Old Harbour, Jamaica.

The generating plant has a gross output of 51 MW, giving a net output from the barge of 50 MW. The electrical power is fed into the distribution grid of the utility company Jamaica Public Service Co Ltd.

The earlier 74 MW power barge, "Dr Bird", was delivered to Jamaica in 1994. It is equipped with eight Wärtsilä 12V46 generating sets. It is also operated by Jamaica Energy Partners. The success and reliability of this power barge, together with the after-sales support from Wärtsilä’s Caribbean office in Puerto Rico, were important factors in securing the contract for the new power barge.

The new power barge provides greater cost efficiency than the existing power barge. Not only do the newer-generation engines have a lower fuel consumption than the older engines but they also have increased power output.

Valuable support for the new contract was provided by Clico Investment Bank of Trinidad and Tobago which arranged bridging financing for the project in a relatively short time.

WhoJamaica energy partners LLC.
What124 MW Dr Bird I and II power plant
WhereOld Harbour, Jamaica
How8X12V46, 3X18V46

This is what we achieved

124MW

Of electrical output.

1st

Power barge designed by Wärtsilä from scratch in order to satisfy the customer requirements.

How we did it

Challenge icon

Challenge

  • Challenging climate conditions
  • Fuel storage capacity and easy operation and maintenance requirement
  • Need for reliable generation capacity
Solution icon

Solution

  • Flexible floating power plants
  • Controlled combustion and an unequalled electrical efficiency
  • Fast starts, stops and load ramps ensure fast load following
Benefit icon

Benefit

  • Provides fast supply of electricity to areas with limited infrastructure
  • Is a mobile asset, possible to relocate or trade
  • Provides secure power supply in the event of an earthquake or flood
Dr_Bird_1920x615

The main details

CustomerJamaica energy partners LLC.
TypeWärtsilä barge power plant
WhereOld harbour, Jamaica
Total output124 MW
FuelOil power plant
ScopeTurnkey contract
Delivery1994, 2005

 

Dr_Bird_Jamaica_map

Would you like to know more?

Contact us

Contact us

Fill in a contact form and our experts aim to be in contact within 1-2 business days. Contact us »

PDF

Read our brochure

Read our product brochure to get all the details.

Location

Find your local office

Find a Wärtsilä office near you. Access the global address book ».

Related solutions and services

Trusted partner to the best companies in the world

Wärtsilä Energy. Let's connect.