Wärtsilä 34SG gas engine

The Wärtsilä 34SG is a four-stroke, spark-ignited, lean-burn gas engine generating set. Its agility and flexibility make the Wärtsilä 34SG generating set an excellent choice for both flexible baseload and balancing renewables applications. It also offers a unique fast-starting capability, which enables rapid response to fluctuations inherent to renewable generation.

Download leaflet

W34SG

Wärtsilä 34SG gas engine helps to provide an efficient, reliable and cost-efficient source of energy for power producers. It also provides enough spinning reserve for balancing whenever needed. The Wärtsilä 34SG engine generating set is extremely reliable as it is based on the well-proven Wärtsilä 32 engine, which has a track record from the mid-1990s. The Wärtsilä 34SG features a wide power output range from 5.6 to 9.8 MW, as it is available in 12V, 16V and 20V cylinder configurations. Wärtsilä engine power plants can be delivered both as EPC and Equipment Delivery contracts.

Key benefits of the Wärtsilä 34SG gas engine

Engine icon
  • No start cost, limitations nor degradation in number of starts
  • Compact sizing enables transportation to demanding locations
  • Capable of operating in high altitude
Fuel icon
  • Runs on natural gas, biogas, synthetic methane and is capable of hydrogen blending
  • Minimal water consumption
Wrench icon
  • Longer maintenance intervals

Customer stories

  • Paras Energy, Nigeria

    Since deciding in 2009 that its three new power plants would operate with Wärtsilä gas engines rather than gas turbines, the conventional choice at that time in Nigeria, Paras Energy has continued to benefit from that decision.

    Read more
    Engineer working in Paras Energy power plant.
  • McArthur River Mine, Australia

    The McArthur River Mine in Australia, is one of the world’s largest providers of zinc in bulk concentrate form. Global energy producer EDL is responsible for supplying power to the mine. Wärtsilä has been a trusted partner for EDL for many years now, delivering gas engines and providing lifecycle services for condition-based maintenance to the power plant. The end result is better fuel efficiency, a low levelised cost of electricity, lower OPEX and guaranteed availability.

    Read more
    MCARTHUR RIVER MINE - AUSTRALIA
  • Makuhari, Japan

    The growing demand for natural gas as fuel and the increasing importance of environmental values in Japan have encouraged investments in gas-fired power generation systems. The green point of view has also contributed to the rise of interest towards trigeneration energy sources.

    Read more
    Makuhari Power Plant, Japan

Our proudest numbers

2 min

to full load

48.9%

Electrical efficiency

1 000

generating sets delivered

Technical data of the Wärtsilä 34SG gas engine

Wärtsilä 34SG gas engine generating set
Cylinder configurations12, 16, 20V
Cylinder bore340 mm
Piston stroke400 mm
Engine speed750 rpm (50 Hz), 720 rpm (60 Hz)
Performance *
 20V34SG16V34SG12V34SG
Rated electrical power (kW)9 795 (50Hz) 9 388 (60Hz)7 830 (50Hz) 7 491 (60Hz)5 840 (50Hz) 5 580 (60Hz)
Electrical efficiency (%)48.9 (50Hz) 48.8 (60Hz)48.9 (50Hz) 48.7 (60Hz)48.0 (50Hz) 47.8 (60Hz)
Heat rate (kJ/kWh)7 363 (50Hz) 7 374 (60Hz)7367 (50Hz) 7396 (60Hz)7 501 (50Hz) 7 538 (60Hz)
Loading and unloading
 Connected to gridFull load
Regular start time (min:sec)00:30< 5
Fast start time (min:sec)00:30< 2
Stop time (min)1
Ramp rate (hot, load/min)> 100%
Minimum Load
Unit level10%
Plant level1%
* Rated electrical power and electrical efficiencies are given at generator terminals at 100kPa ambient pressure, 25°C suction air temperature and 30% relative humidity, and without engine driven pumps. Power factor 1.0 (site). Electrical efficiency with 5% tolerance. Site conditions, fuel and applicable emission limits may have an impact on performance figures. Please contact Wärtsilä for project-specific performance data. Emission figures for LBF must be evaluated case by case. Catalyst systems are designed based on project specific requirements. Certain fuel components are poisonous for catalyst elements. Maximum amount of these components to be limited in the fuel in applications where catalyst system is installed.
Disclaimer: The information contained herein is provided for informational purposes only and may not be incorporated, in whole or in part, into any agreement or proposal. No representation of any kind is made in respect of any information contained herein and Wärtsilä expressly disclaims any responsibility for, and does not guarantee, the correctness or the completeness of the information. The calculations and assumptions included in the information do not necessarily take into account all the factors that could be relevant in a particular case. Information herein shall not be construed as a guarantee or warranty of the performance of any Wärtsilä technology, equipment or installation.

 

Would you like to know more?

Contact us.

Contact us

Fill in a contact form and our experts aim to be in contact within 1-2 business days. Contact us »

PDF

Read our leaflet

Read our product brochure to get all the details. Download leaflet »

Location

Build your own power plant

1MWh

1MW

100MW

200MW

300MW

400MW

> 500MW

Liquid fuels

Natural gas

Liquid fuels and gas

Flexible baseload (>6000 running hours annually)

Intermediate load (2000 - 6000 running hours annually)

Peaking and grid stability (<2000 running hours annually)

Emergency

By checking this box you agree to receive communications for marketing purposes. You can unsubscribe at any time.

Read more about how we process data in our Legal & Privacy Notice

Related solutions and services

Insights - news and articles

Wärtsilä_Engines_Website_Banner_1920x800
29 May 2024 · Article
6 min read
Faster, cheaper, cleaner: The grid balancing technology shaping our renewable future
We stand at a tipping point in the energy transition. By the...
17 Apr 2024 · Article
4 min read
The Carbon Impact Curve: Unpacking the Energy Transition's Complexity
The early days of the energy transition held a comforting promise. Replacing...
Boy on train
21 Nov 2023 · Article
5 min read
Every Second Counts for our flexible energy future
It’s now or never to meet climate goals.
Wärtsilä Energy. Let's connect.