• Flexicycle Power Plant
    Powering Africa with Wärtsilä's Flexible Engine Technology

    Wärtsilä engines are the best choice to provide flexible, efficient and decarbonised energy to the continent

Why choose engine technology over turbines?

Engine power plants offer flexible, efficient, and reliable power generation;  providing an ideal solution to utilities as they pursue renewable energy and decarbonization goals. 

Wärtsilä engines can respond to any grid needs within five minutes, maintain high performance under extreme operating conditions and are fuel flexible - able to run on natural gas, biogas, fuel oil, LPG, other liquid fuels, and hydrogen blends

 

Medium-TEPPowerPlant-11

Book a consultation with our experts:

Find out how our products and services can provide the flexible and effective solutions for your specific energy needs. Fill out the contact me form, including some information about your needs, and we will get in touch with you

Sujen Balakisson 

Business Development Manager
East and Southern Africa
Wärtsilä Energy

profile

David Szymanski

General Manager, Business Development
West and North Africa
Wärtsilä Energy

Reports

Wärtsilä in Africa

7.6 GW

of engine power plant capacity installed.

46

countries served in Africa

600+

engines installed across the continent

180+

customers across the continent

 

Our engines' impact globally:

  • AGL-Reference-image
    AGL Energy Limited - Australia

    To improve its energy reliability, AGL Energy Limited, one of Australia’s leading integrated energy companies, turned to Wärtsilä for dispatchable power.

    Learn more
  • limbe-power-plant-reference-slide
    Limbe Power Plant - Cameroon

    Eneo Cameroon’s Limbe power plant could generate only about 40% of the installed total capacity of 80MW. Wärtsilä’s solution was a complete rehabilitation; a total overhaul of four Wärtsilä 18V46 engines and five alternators.

    Learn more
  • Chambersburg
    Chambersburg peaking power plant - USA

    Chambersburg updated the automation system of their 23-megawatt power plant consisting of four Wärtsilä 18V32DF dual-fuel engines to achieve better reliability. The upgrade enables faster ramp-up times and minimizes start failures, which are key features for getting the power plant online quickly.

    Learn more
  • Kenya East Africa’s Power House2
    Gulf Power - Kenya

    The tailor-made O&M contract was a result of a natural process and the team to operate and maintain the power plant was assigned locally from Wärtsilä Eastern Africa. The plant provides base load power to the national grid of Kenya.

    Learn more
  • Paras Energy
    Paras Energy, Nigeria

    Since deciding in 2009 that its three new power plants would operate with Wärtsilä gas engines rather than gas turbines, the conventional choice at that time in Nigeria, Paras Energy has continued to benefit from that decision.

    Learn more
  • Kaloum 5 - Republic of Guinea
    Kaloum 5 - Republic of Guinea

    Power plant overhaul boosts availability and grid stability.

    Learn more
  • Bali 200 MW
    PLTD Pesanggaran, Indonesia

    Grid stability in Indonesia – 200MW multi-fuel power plant generating reliable electricity in Bali with operational and fuel flexibility

    Learn more
  • marquette
    Marquette Energy Center - Michigan, USA

    Flexible power plant provides reliability with sustainable fuels in The Great Lakes state. In order to secure a reliable energy supply and enable more renewable energy, Marquette Board of Light and Power (MBLP) in Michigan, USA, opted for Wärtsilä Smart Power Generation technology.

    Learn more
  • Makuhari Power Plant, Japan
    Makuhari - Japan

    The Wärtsilä 34SG engines combined with cooling and heating properties allow ENAC to focus on its core competence of providing energy services to its nine main customers. The solution provided by Wärtsilä is in line with the environmental values of ENAC as well as the energy and heat demand of the Makuhari New City.

  • Manisa Power Plant
    Manisa - Turkey

    Wärtsilä was awarded a power plant contract for an 85 MW replacement, and extension of an existing diesel power plant at Manisa in Western Turkey. It involved the very first three Wärtsilä 50DF generating sets for a power plant installation, delivered in 2004. Four Wärtsilä 34SG sets were added in an extension in 2005.

    Learn more
  • Benndale, Mississippi, USA
    Cooperative Energy - Benndale, MS, USA

    Cooperative Energy was looking to upgrade one of its plants in order to help it supply affordable, flexible and reliable power. Wärtsilä’s comprehensive solution comprises a plant powered by two gas-fired Wärtsilä 31SG engine generating sets and covered by a 10-year service agreement.

    Learn more

Articles

Wärtsilä 20 marine engine
10 Apr 2024 · Article
3 min read
Gas Engines are the Perfect Solution for Energy Transition
As the world continues its journey towards a sustainable future, the debate over the best...
Yamama Cement power plant
25 Apr 2024 · Article
3 min read
Revolutionising Energy Provision: The Effectiveness of Gas Engine Technology
In the ever-evolving landscape of energy provision, the choice of...
6 Jul 2023 · Article
6 min read
Three reasons engines are driving the energy transition
Our modern world runs on electricity, powering our society, driving our economy, and...
Energy solutions for mining
26 Apr 2022 · Article
5 min read
Renewables, energy storage and flexible gas power plants can drive industry in South Africa on road to decarbonisation
One of the major challenges...
Wärtsilä Energy - Nette Lehtinen - Without balancing technologies, renewables won’t decarbonise the energy sector
24 Jan 2023 · Article
5 min read
Without balancing technologies, renewables won’t decarbonise the energy sector
We need more renewables, but their intermittency won't provide...
Interview-Heikkinen_Mentor
25 Aug 2022 · Article
24 min read
How do we build the energy system of the future?
Target-setting is the first step towards further action. But what action?

Press releases

Wärtsilä renews its partnership with ONEE for the maintenance of two power plants in Morocco

Jun 25, 2024, 09:01 by Wärtsilä Corporation

Technology group Wärtsilä has signed a five-year Maintenance Agreement covering 169,5 MW of power generation for two Moroccan power plants. The plants are owned and operated by the Office National de l’Electricité et de l’Eau potable (ONEE), Morocco‘s public utility in charge of the production, transport and distribution of electricity. This agreement is a renewal of a previous five-year contract for the power plants in Tan Tan and Dakhla, in southern Morocco. Each of these two emergency plants operates with Wärtsilä 46 engines.

The scope of the agreement includes supply of spare parts, major overhauls, and full technical support. It takes effect in Q1, 2024, and will minimise the total cost of ownership of the plants’ Wärtsilä assets. 

“Our customers value maintenance agreements as they ensure the efficiency, reliability and availability of the power plants. We are proud to have been awarded a renewal of this agreement and continue our long-term relationship with ONEE," comments Patrick Borstner, Director, Operations Africa at Wärtsilä Energy.

The Tan Tan and Dakhla plants are expected to be used to balance renewable energy production with sustainable fuels. Morocco is utilising an increasingly large share of renewable energy, and the Wärtsilä engine technology can reach full output in a matter of minutes to balance the intermittent supply of renewables. Morocco also has an ambitious hydrogen development plan, for which the Wärtsilä engines could be converted to operate with eventually.

ONEE is a long-established customer for Wärtsilä, and has, among its large number of production assets, two power plants operating with Wärtsilä engines in Tan Tan and Dakhla. 

Media contact for more information on this release:
Katri Pehkonen
Communications Manager
Wärtsilä Energy
Mob: +358 50 591 6180
katri.pehkonen@wartsila.com

Image caption: From left to right: Julien Brachet, Mohamed Sadouk, Zakaria Choubi, Abdallah Boukind, Hamid Lkadi, Babacar Diouf and Patrick Borstner
©Wärtsilä  

All Wärtsilä releases are available at https://www.wartsila.com/media/news-releases and at http://news.cision.com/wartsila-corporation where also the images can be downloaded.

Use of the image(s) is allowed only in connection with the contents of this press release.

Wärtsilä images are available at https://www.wartsila.com/media/image-bank.

Wärtsilä Energy in brief
Wärtsilä Energy is at the forefront of the transition towards a 100% renewable energy future. We help our customers and the power sector to accelerate their decarbonisation journeys through our market-leading technologies and power system expertise. Our solutions include flexible engine power plants, energy storage and optimisation technology, and services for the whole lifecycle of our installations. Our engines are future-proof and can run on sustainable fuels. Our track record comprises 79 GW of power plant capacity, of which 18 GW are under service agreements, and over 125 energy storage systems, in 180 countries around the world.
www.wartsila.com/energy

In Morocco, Wärtsilä has been accompanied for over forty years by its local partner, the company Salva (https://salva.ma/), Wärtsilä Energy's representative for the Services business.

Wärtsilä in brief
Wärtsilä is a global leader in innovative technologies and lifecycle solutions for the marine and energy markets. We emphasise innovation in sustainable technology and services to help our customers continuously improve environmental and economic performance. Our dedicated and passionate team of 17,800 professionals in more than 280 locations in 79 countries shape the decarbonisation transformation of our industries across the globe. In 2023, Wärtsilä’s net sales totalled EUR 6.0 billion. Wärtsilä is listed on Nasdaq Helsinki.
www.wartsila.com

More on our local websites

Wärtsilä Energy. Let's connect.